Use Case · Waste Carriers

Digital Waste Tracking Software for Waste Carriers

Phase 2 brings waste carriers onto Digital Waste Tracking, with a public beta from April 2027. Get your drivers on digital notes now, so phase 2 is a smaller step.

  • Live on DWT today
  • Signed on the driver’s phone
  • Set up before phase 2
A waste carrier's lorry on the road from a customer's premises to a receiving site, with a complete digital waste transfer noteCOLLECTED · 07:30Mixed packagingEWC 15 01 06 · Trade customerCarrier registrationUpper tier ✓Sent via Linked

Phase 2 is coming for carriers.

Receiving sites went first. Carriers, collectors, brokers and dealers are next.

  1. October 2026

    Phase 1 live

    Permitted receiving sites in England and Wales report every load they take in.

  2. Autumn 2026

    Phase 2 private beta

    A private beta of the phase 2 service begins, ahead of the public one.

  3. January 2027

    Scotland & Northern Ireland

    Phase 1 starts for receiving sites in the other two nations.

  4. April 2027

    Phase 2 public beta

    Carriers, brokers and dealers can start using the service with real loads.

  5. October 2027

    Phase 2 mandatory

    Expected date carriers must use Digital Waste Tracking.

Dates as announced by Defra and NetRegs; phase 2 is subject to the final regulations. More detail in our phase 2 guide for carriers.

Why carriers are different.

You don't own the site at either end of the journey, but your paperwork decides how smoothly both ends go.

Phase 1 already lands on you

Receiving sites now report every load, and most of what they need comes from your paperwork. Missing details mean queried loads at the gate.

Drivers, not desks

Your paperwork is done in a cab or on a customer’s doorstep. Whatever phase 2 asks for has to work on a phone.

Many sites, many demands

You tip at transfer stations, recyclers and treatment plants, each with its own system and its own idea of a complete note.

Details before the wheels turn

The government’s direction for phase 2 is information entered before a movement starts, then confirmed by carrier and receiver.

Your registration on everything

Receivers need your carrier registration and vehicle reg on every record. An expired or missing number stops a load.

Brokers and dealers too

If you arrange waste movements without carrying them, phase 2 names you as well.

What phase 2 will need. What you have now.

Defra hasn't published the detailed carrier specification yet. This is the direction it has set, and what WasteBolt already captures.

Expected in phase 2

  • Movement details entered before the waste moves
  • Carrier and receiver update and confirm the record
  • Records updated within two working days
  • Carrier registration, vehicle, EWC codes and quantities

Already in WasteBolt today

  • Your carrier registration and vehicle reg on every note
  • EWC code and description from your saved pick lists
  • Producer, carrier and receiver on one record
  • Signatures with time stamps, captured on the driver’s phone
  • Signed PDF to every party straight away
  • Notes passed to receiving sites through Linked

Driver phones

Signed at collection.

The driver fills in the note on their phone with your registration and vehicle already on it, the customer signs on screen, and the PDF is in their inbox before you pull away.

  • Drivers log in on their own phone: up to 10 on Pro, 25 on Enterprise
  • Customer signs on screen at collection, or remotely with a signing link
  • Your registration and vehicle details filled in automatically
  • Signed PDF emailed to the customer straight away
  • The office sees every note the moment it’s signed
Digital waste transfer notes →
A waste transfer note on a driver's phone, signed on screen by the customer and sent as a PDFNEW WTNCustomerTrade accountWasteMixed C&D · 17 09 04Skip8-yard · exchangeCustomer signatureSign & send PDFSigned 11:20PDF emailed

Handing over at the gate? It depends what the site runs.

Receiver on WasteBoltWasteBolt LinkedSend the note through Linked. It lands in their account ready for their DWT submission, with nothing re-keyed.
Receiver on other softwareComplete PDFHand over a signed PDF with every field their submission needs: your registration, vehicle, code and quantity.
Hazardous loadsConsignment notesHazardous waste consignment notes, signed on screen, alongside your standard WTNs.

Today the receiving site reports each load to Digital Waste Tracking. A complete note from you means it goes through first time.

How it works for a waste carrier.

Set up now, run it on every collection, and be ready when phase 2 opens.

01

Set up once

Your carrier registration, vehicles, regular customers and the codes they need. Add a seat for each driver.

02

Sign at collection

Drivers complete the WTN on their phone and the customer signs on screen, or by link if they are out.

03

Hand over at the gate

Pass the note to the receiving site through Linked, or give them a complete PDF for their DWT submission.

04

Ready when phase 2 opens

When the phase 2 service opens, your movement records are already in WasteBolt.

Pick the route that fits your business.

From one van to a fleet, or arranging movements you never touch.

Owner-driver

Single-vehicle carrier

Create and sign notes on your own phone, keep every record in one place and hand over complete paperwork at every tip.

See plans and pricing →

Several vehicles on the road

Fleet with drivers

A seat for every driver, a live view of every note from the office, and reports by driver, customer and waste type.

Digital waste transfer notes →

You arrange, others carry

Brokers and dealers

Keep the paperwork for every movement you arrange in one account, or let our team handle the Digital Waste Tracking side.

Waste broker use case →

Phase 2: beta April 2027, mandatory expected October 2027

Phase 2 of Digital Waste Tracking brings waste carriers, collectors, brokers and dealers onto the service. The public beta is the time to test with real loads, well before it becomes mandatory.

Read the phase 2 guide for carriers

Waste Carrier FAQ.

Questions we hear from carriers getting ready for phase 2.

When do waste carriers have to use Digital Waste Tracking?

Phase 2 brings waste carriers, collectors, brokers and dealers onto the service. A public beta is due to open in April 2027, and mandatory use is expected from October 2027. Scotland and Northern Ireland are working to the same month for phase 2.

Do I need to do anything before phase 2?

Legally, nothing new until phase 2. But phase 1 already affects you: receiving sites must report every load, using your carrier registration, vehicle reg, EWC codes and quantities. Carriers who hand over complete digital notes today are easier to work with, and will find phase 2 a much smaller step.

Will WasteBolt submit my records to Digital Waste Tracking in phase 2?

That is the plan. WasteBolt is already live on the service for receiving sites, and we are building the carrier side against the phase 2 public beta from April 2027. Defra has not yet published the detailed phase 2 specification, so no software can submit carrier records today. When it opens, your movement records will already be in WasteBolt.

Does phase 2 replace waste transfer notes?

Not yet. Digital Waste Tracking does not replace your Duty of Care: you still need compliant waste transfer notes and, for hazardous waste, consignment notes. WasteBolt creates both digitally, signed on screen.

What will phase 2 cost?

No official phase 2 fee has been announced. The phase 1 service charge for receiving sites is currently £26 a year. Be wary of anyone quoting a phase 2 fee as fact.

Does my carrier registration go on every note?

It should, and receiving sites need it for their submissions. WasteBolt adds your carrier registration and vehicle details to every note automatically. If you need to check your registration, see our guide to waste carrier licences.

What if we don't have time to run it ourselves?

Our Done For You service can run your paperwork and checks for you now, and take on the Digital Waste Tracking side once phase 2 opens, from the same WasteBolt account.

Be ready before the beta opens.

Add your drivers, sign tomorrow's first collection on a phone and hand over a complete note at the gate. 30-day free trial, no credit card.