Use Case · Inert Recycling
Digital Waste Tracking Software for Inert Waste Recycling
Rubble, soils and planings in on WTNs and reported to Defra. Recycled aggregate and topsoil out as product once they meet end-of-waste requirements, and rejects documented as the waste they still are.
- GOV.UK listed DWT software
- Waste and product kept apart
- Works with your weighbridge
Why inert recycling is different.
You take in waste and sell product. Everything depends on proving which is which, and when one becomes the other.
Waste in, product out
Rubble and soil arrive as waste and leave as aggregate and topsoil. Your records have to show where one stops and the other starts.
The code on every load matters
The Aggregates Quality Protocol only accepts certain waste codes as inputs. A wrong code on the way in can undermine the product on the way out.
Demolition and groundworks hauliers
The same hauliers bringing load after load from the same jobs, all day, on the same codes.
Soils need checking
Soil contaminated enough to be hazardous is 17 05 03*, not 17 05 04. What you accept has to match what the producer told you.
Planings and coal tar
Road planings are non-hazardous unless they contain coal tar, and then they are hazardous waste under a different code.
Rejects go back out
Screening rejects, wood and metal picked off the line all leave as waste, each load on its own note.
End of waste
Waste in on record. Product out with proof.
Your product is only as good as the record of what went into it. WasteBolt keeps every load in on its code, reports it to Defra, and documents the rejects that leave as waste, while your sales stay where they are.
- Every load in on its code, from its haulier and job, reported to Defra
- Tonnage in by EWC code: the input record your end-of-waste route relies on
- Rejects, wood and metal out on WTNs from saved templates
- Import only the waste rows from your weighbridge export
- Product sales stay in your weighbridge or sales system
From the weighbridge to the Defra receipt.
What happens to a load of rubble or soil at an inert recycler running WasteBolt.
Inert waste in
- Brick & concrete rubble
17 01 07 - Soil & stones (construction)
17 05 04 - Soil & stones (gardens & parks)
20 02 02 - Road planings (no coal tar)
17 03 02 - Track ballast
17 05 08 - Screened minerals
19 12 09
Weighbridge
Waste tickets picked up or imported. Sales tickets left out.
WasteBolt
The haulier's and job's template fills the rest. WTN created, carrier registration checked.
Defra DWT
Submitted automatically or in one click. Receipt ID stored for audit.
Codes shown are the common inert ones. More in our EWC codes for C&D waste guide.
Leaving site? Product or waste depends on what it is.
This is the position in England. Scotland, Wales and Northern Ireland have their own rules, so check the current position for your site and process.
How it works at an inert recycler.
Set up your hauliers and jobs once, then let the weighbridge do the work.
Set up hauliers and jobs
A template for each haulier, job and waste code you accept, matched to your weighbridge tickets.
Weigh it in
Waste tickets picked up or imported by code, ready for your protocol records. Regular hauliers on Hot Picks.
WasteBolt reports it to Defra
Each load becomes a WTN and is submitted to Digital Waste Tracking. The receipt ID is stored against it.
Show what went in
Tonnage in by code, haulier and date, exported as CSV or PDF for your permit returns and protocol records.
Pick the route that fits your site.
Same records and the same Defra submission, whatever you crush, screen or blend.
Weighbridge for waste and sales
Crushing and screening site
Import your weighbridge export or connect it through Gatehouse, with only the waste rows becoming WTNs.
Weighbridge CSV import →Soils in, screened soil and topsoil out
Soil recycling and topsoil
Regular groundworks hauliers as Hot Picks, with soils that fail acceptance documented on the way back out.
How Gate Hot Picks works →Crusher on a restoration site
Recycling at a quarry
Run recycling and restoration from the same account, with waste in and product out kept apart.
Quarries use case →DWT is live for permitted inert recyclers
Permitted waste receiving sites in England and Wales have had to report every load of waste to Defra's Digital Waste Tracking service since 1 October 2026, including crushing, screening and soil recycling sites. Scotland and Northern Ireland follow on 1 January 2027.
How WasteBolt's digital waste tracking software worksInert Recycling FAQ.
Questions we hear from aggregate and soil recyclers.
Do inert recycling sites have to use Digital Waste Tracking?
Yes, if the site is permitted and receives waste. Permitted receiving sites must report every load of waste they take in to Defra's Digital Waste Tracking service: in England and Wales since 1 October 2026, and in Scotland and Northern Ireland from 1 January 2027. If you crush or screen under a waste exemption rather than a permit, check the current Defra guidance on when exempt sites are brought in.
When does recycled aggregate stop being waste?
When it is produced to the Aggregates Quality Protocol and meets its requirements, including acceptable input waste codes and factory production control. Until then it is still waste and moves on a WTN.
Is manufactured topsoil a product?
Only once it meets end-of-waste requirements. Topsoil made from waste soils that hasn’t reached that point is still waste and needs a WTN. Check the current Environment Agency position for your process.
Do soils moved under the CL:AIRE Code of Practice need waste paperwork?
Soils reused under a declared Materials Management Plan, in line with the CL:AIRE Definition of Waste Code of Practice, are not treated as waste. They need no transfer note and are not reported to Digital Waste Tracking. Anything moved outside the plan is waste.
Which code do we use for road planings?
Planings without coal tar are usually 17 03 02, which is non-hazardous. If testing shows coal tar, they are hazardous waste under 17 03 01* and move on a hazardous waste consignment note.
Will our product sales end up in Digital Waste Tracking?
No. Only waste loads become WTNs and Defra submissions. When you import a weighbridge export you choose the rows to bring in, and automatic processing only turns rows that match your waste templates into WTNs.
What if we don't have time to run it ourselves?
Our Done For You service handles DWT submission for you, using the same WasteBolt account so your records stay in one place.