Use Case · Quarries
Digital Waste Tracking Software for Quarries
Soils and rubble in for restoration, reported to Defra straight from the weighbridge. Aggregate sales kept out of it, and rejected loads documented on the way back out.
- GOV.UK listed DWT software
- Waste and sales kept apart
- Works with your weighbridge
Why quarries are different.
A quarry sells product over the same weighbridge it takes waste in on. Digital Waste Tracking only wants one of them.
Waste in, product out, one weighbridge
The same weighbridge weighs soils coming in for restoration and aggregate going out for sale. Only one of those is waste.
Muckaway from every job
Groundworks and demolition hauliers bring load after load from the same development, all on the same code.
Inert means inert
Plastic, wood or anything else that isn’t inert can’t go in the void. The record has to show what you accepted.
Rejected loads go back out
A contaminated load turned away at the face leaves as waste, and needs its own note when it does.
Restoration on a permit
Your permit sets what can go in the void. Your returns need tonnage by code and customer to show it.
Recycled aggregates
Crushing and screening on site turns waste into product, but only when it meets the end-of-waste rules.
One weighbridge, two flows
Waste in. Sales out. Kept apart.
Your weighbridge doesn't care whether a load is muckaway or Type 1. Your waste records do. WasteBolt takes the waste tickets, turns them into WTNs and Defra submissions, and leaves your sales where they are.
- Only the waste tickets become WTNs and Defra submissions
- Pick the waste rows when you import, or let import templates match your waste materials
- Anything that doesn’t match waits for review instead of being sent
- Gate Hot Picks for regular hauliers and jobs, if you log at the gate
- Aggregate sales and the aggregates levy stay in your weighbridge or sales system
From the weighbridge to the Defra receipt.
What happens to a load of inert waste at a quarry running WasteBolt.
Inert waste in
- Soil & stones (construction)
17 05 04 - Soil & stones (gardens & parks)
20 02 02 - Concrete, bricks & tiles
17 01 07 - Concrete
17 01 01 - Bricks
17 01 02 - Screened minerals from treatment
19 12 09
Weighbridge
Waste tickets picked up or imported. Sales tickets left out.
WasteBolt
The haulier's and job's template fills the rest. WTN created, carrier registration checked.
Defra DWT
Submitted automatically or in one click. Receipt ID stored for audit.
Codes shown are the common inert ones. Look up any other in our free EWC code list.
One hub for everything in and out.
Every waste load coming in, every rejected load going out. One account, one set of records, one report.
In
- Weighbridge waste ticketsPicked up or imported, without the sales tickets.
- Gate Hot PicksRegular hauliers and jobs, one input each.
- Notes from hauliersPassed to you through WasteBolt Linked.
- Paper notesPhotographed and read with Snap & Go.
Out
- Rejected loadsContaminated loads back out on a WTN, e.g. 17 09 04.
- Screening rejectsFrom crushing and screening, e.g. 19 12 12.
- Everything elseSite waste on standard transfer notes.
Leaving site? It depends what it is.
This is the position in England. Scotland, Wales and Northern Ireland have their own rules, so check the current position for your site.
How it works at a quarry.
Set up your hauliers and jobs once, then let the weighbridge do the work.
Set up hauliers and jobs
A template for each haulier, job and waste material your permit allows, matched to your weighbridge tickets.
Weigh it in
Waste tickets picked up or imported, sales left out. Regular loads at the gate on Hot Picks.
WasteBolt reports it to Defra
Each waste load becomes a WTN and is submitted to Digital Waste Tracking. The receipt ID is stored against it.
Report for your permit
Tonnage into the void by code, customer and date, exported as CSV or PDF for your returns.
Pick the route that fits your quarry.
Same records and the same Defra submission, however your site is permitted.
Weighbridge for sales and waste
Restoration quarry
Import your weighbridge export or connect it through Gatehouse, with only the waste rows becoming WTNs.
Weighbridge CSV import →Permitted as a landfill
Inert landfill in a quarry
The same gate automation as a landfill: clean loads to Defra on their own, exceptions flagged with the reason.
Landfill use case →Crushing and screening on site
Quarry with a recycling plant
C&D waste in on WTNs and DWT, screening rejects out on notes, recycled aggregate out as product.
Inert recycling use case →DWT is live for permitted quarries
Permitted waste receiving sites in England and Wales have had to report every load of waste to Defra's Digital Waste Tracking service since 1 October 2026, including quarries taking inert waste for restoration. Scotland and Northern Ireland follow on 1 January 2027.
How WasteBolt's digital waste tracking software worksQuarry FAQ.
Questions we hear from quarry and restoration operators.
Do quarries have to use Digital Waste Tracking?
Yes, if your quarry is permitted to receive waste, whether for restoration, as an inert landfill or for recycling. Permitted receiving sites must report every load of waste to Defra's Digital Waste Tracking service: in England and Wales since 1 October 2026, and in Scotland and Northern Ireland from 1 January 2027. Primary aggregate you sell isn't waste. If you use waste under an exemption rather than a permit, check the current Defra guidance.
Will our aggregate sales end up in Digital Waste Tracking?
No. Only waste loads become WTNs and Defra submissions. When you import a weighbridge export you choose the rows to bring in, and automatic processing only turns rows that match your waste templates into WTNs. Anything else waits for review.
Does WasteBolt handle the aggregates levy?
No. Aggregate sales and the aggregates levy stay in your weighbridge or sales system. WasteBolt handles the waste side: WTNs, Digital Waste Tracking and reporting on what went into the void.
Which EWC code do we use for muckaway?
Soil and stones from construction sites are usually 17 05 04, and from gardens and parks 20 02 02. Screened soil from a treatment site is usually 19 12 09. Whatever the code, the load has to be inert and one your permit allows.
What about loads we reject?
A rejected load is still waste when it leaves your site. Raise a WTN for it from the same account, back to the haulier or on to a permitted site that can take it.
Will it work with our weighbridge software?
In most cases, yes. Any weighbridge system that can export a CSV can be imported with saved column mappings, and Gatehouse can pick up exports from your weighbridge folder automatically.
What if we don't have time to run it ourselves?
Our Done For You service handles DWT submission for you, using the same WasteBolt account so your records stay in one place.